This page assembles that scheme from the site's ranges: MIC300/MIC100 fixed points, the 500-gas platform breadth for toxic variety, PID/FID instruments for the VOC programme, and controllers to bind it together.

Unit by unit
Start from the process inventory: chlorine, ammonia, hydrogen sulfide, carbon monoxide, hydrogen, solvents — each unit's credible releases decide its points, principles and alarm philosophy. Fixed transmitters with the right sensor per point (catalytic for combustibles, electrochemical for toxics, infrared where poisons or oxygen-free streams rule out beads) report through alarm controllers that drive ventilation and isolation.
The toxic gas guide is the family's index; each named gas's own guide carries its spans and working pattern.
The leak programme
Chemical plants leak at components — valves, flanges, seals — thousands of small interfaces whose fugitive emissions are both a compliance number and a product loss. LDAR programmes with FID/PID analyzers (PTM100) walk those components; screening portables find the neighbourhood, the analyzer quantifies the source, and the repair loop closes it. The VOC guide and the FID/PID comparison carry the detail.
Unit-by-unit gas personalities
A chemical complex is a federation of atmospheres. The chlor-alkali unit watches chlorine and hydrogen; the ammonia plant watches ammonia and its own hydrogen-nitrogen world; the ethylene oxide unit guards a gas that is toxic, flammable and self-reactive in one; solvent plants patrol a rotating cast of vapours that only PID and FID can census cheaply. Site detection standards set the common grammar — alarm stages, calibration discipline, data handling — while each unit's scheme is written in its own chemistry. The planner's deliverable is that pair of documents: the grammar and the unit chapters, kept consistent as processes change.
Management of change: detection's quiet killer
More detection schemes are invalidated by plant change than by sensor failure: a new solvent in an old store, a rerouted vent, a temporary reactor that stayed for a decade. Management-of-change procedures should carry a detection question in their checklist — does this change add a gas, move a source, alter a ventilation path, reclassify an area — and schemes should be re-walked on a cycle even without changes, because plants drift invisibly. The re-walk is unfashionable, unglamorous and the highest-value day in the detection calendar.
Loading, laboratories and the edges
The plant's edges breed its incidents: road and rail loading where hoses and arms connect and disconnect all day, sample points where streams are drawn by hand, laboratories where small quantities of everything meet, warehouses where drums of unlike chemistries neighbour. Each edge gets its proportionate layer — loading bays with vapour detection and earthing interlocks, sample stations with local extraction and personal instruments, laboratories with room monitoring matched to their inventory. Edges are where the unit chapters of the scheme meet the public, the contractor and the delivery driver, and they deserve writing with those audiences in mind.
Specifying a chemical site's detection standard
The site standard is the deliverable that outlives every project: it fixes the alarm grammar (stages, tones, colours, meanings), the approved sensing principles per gas family with their interference doctrines, the calibration and proof-test regime with its evidence requirements, the data model that area systems feed, and the change-control questions every modification must answer. Projects then specify by reference — this unit, these gases, this many points, this standard — and the site accumulates a coherent, maintainable safeguard instead of a museum of project decisions. Writing the standard is senior work: it needs the process chemist, the instrument engineer, the safety case author and the maintenance manager in one room, arguing from the site's own incident history. Suppliers can support that writing with principle expertise and configuration evidence, but the standard itself must be the site's, because the site is what it protects.
Chemical plant detection terms
Unit — the semi-autonomous process island whose gas personality the site standard must individually name. Chlor-alkali — the electrolysis complex where chlorine and hydrogen are made side by side. Ethylene oxide — the sterilant and feedstock that is toxic, flammable and self-reactive in one molecule. Phosgene, isocyanates, anhydrous acids — the site's named nightmares, each with a detection chapter in serious standards. Gas cabinet — the extracted enclosure in which toxic cylinders live and are first monitored. Scrubbed vent — the treated exhaust whose monitor proves the treatment.
Management of change — the procedure whose checklist must ask what a modification does to the gas map. HAZOP — the structured study whose deviations name the releases detection must catch. SIS and SIL — the safety-instrumented layer to which detection sometimes reports, with its own evidence discipline. Bund — the containment wall whose floor is where heavy vapours spend their first minutes. Sample point — the hand-drawn stream location where operator and process meet daily. Loading gantry — the transfer structure where hoses, arms and earthing interlocks share duty with vapour detection.
Neighbours: the fence-line chapter
Chemical sites end at a fence, and their obligations do not: several of the site's gases are community concerns at concentrations far below workplace interest, and the mature sites monitor their boundary with the same seriousness as their units — not because the fence-line instruments protect the plant, but because the plant's licence is partly written in the neighbourhood's air. Fence-line data, published or ready to be, changes internal behaviour too: releases that would once have been internal events acquire an audience, and the audience disciplines the maintenance that prevents them. Detection's social function — making the invisible undeniable — reaches its fullest form at the fence, which is reason enough for this chapter to close the application.
The night the wind changed
Every chemical site keeps one story of the night the wind changed: a routine release, meteorologically rerouted, arriving at a part of the plant — or a part of the town — that its designers had filed under 'downwind of nothing'. The story's moral is not that dispersion is treacherous but that detection geography drawn from prevailing winds is a fair-weather document. Mature sites therefore place their community-facing and muster-route points for the wind rose's whole compass, rehearse the unusual-wind scenario in their emergency exercises, and read their fence-line archive for the rare-direction days specifically. The instruments are the same; the imagination that placed them is the safeguard.
Small print: detectors in the contractor's container
A chemical site's atmosphere is also worked by a small city of contractors whose instruments arrive in their own containers, calibrated to their own employers' standards. The site standard should reach into that container — not by confiscation but by interface: gate checks of calibration currency, bump verification at the permit office for critical work, the site's alarm grammar briefed as a condition of entry. The atmosphere does not audit employers before it harms people, and the site's duty of coherence extends exactly as far as its fence. Sites that manage the interface politely and firmly find contractors rising to it; the container, inspected kindly, usually contains a programme that appreciates being taken seriously.
The unit's gas personality, written for the relief shift
Every unit's gas chapter should be readable by a relief operator at 3 a.m. without a chemist: the gases in the order they can hurt, the points in the order they will speak, the actions in the order they must happen. Sites achieve that readability by writing the chapter from the alarm backwards rather than from the chemistry forwards — a discipline editors call audience-first and operators call survival. The chemistry belongs in the appendix, where it will be consulted in daylight by people with time; the chapter's face belongs to the night. Standards that mandate the two-layer writing get both rigour and readability, which is why this application insists on it.
Send a target gas list, get a configuration
Quotations are built from the published parameters on this site. Tell us the gases, the ranges and the quantity — or the point schedule for a fixed project — and the reply comes back within 24 hours.
Request a quotation